WELLHEAD STACK UP

  • Project:

    Multibowl Stack up Operations

  • Client:

    Total E & P Nigeria Limited

  • Location:

    Kenyon Base

Oil production becomes challenging when a wellhead isn’t properly installed. For this job, we supplied and installed quality wellhead equipment. This multibowl stack up operation carried out at AMENAM Campaign was properly structured to enable maximum production.

It is in our practice to recommend the best wellhead systems to our customers that meet their desired well specifications. At Kenyon, we provide the best wellhead services that meet and exceed our clients’ expectations.

Job Status: Completed